Posts

Showing posts from October, 2026

A Title Survey Melbourne Owners Should Get Before They Build

Image
  Most property owners assume their physical fence line matches their legal title boundary. In many cases it does not, and the gap between what sits on the ground and what the title actually records creates costly problems the moment a sale, build or subdivision is attempted. Encroachments left unidentified at purchase can affect future development, generate neighbour disputes and in some cases lead to adverse possession claims that take years to resolve. A title survey in Melbourne , formally known as a Title Re-establishment Survey in Victoria, is the only reliable way to confirm where a property's legal limits actually sit. It can also identify any encumbrances, easements or restrictions on the title that affect what can be built or how the land can be used, and in Victoria this survey can only be legally carried out by a licensed surveyor. Linear Land Surveying carries out title surveys for homeowners, developers and builders across Melbourne and regional Victoria using cali...

Handle Removal of Covenants Without Stalling Your Project

Image
A restrictive covenant sitting on a title can block a renovation, a second dwelling or a subdivision long after the reason it was created has stopped being relevant to the property. Finding this out midway through planning, once a design is already drawn up, is one of the more expensive ways to discover a covenant exists. Removal of covenants in Victoria requires precise title and site data, a compliant application and the right legal pathway, and getting any of these wrong risks delays, rejection or a costly redesign. It is a technical and legal process best guided by a licensed surveyor working alongside a solicitor rather than attempted alone. How the Process Works A covenant can be removed by applying to the Supreme Court of Victoria, applying for a planning permit to remove or vary the restriction, or requesting an amendment to the planning scheme, depending on which mechanism suits the title. Linear Land Surveying reviews the covenant, prepares the required data and plans, an...

An Existing Conditions Survey Melbourne Designers Rely On

Image
Design work that starts without measured site data leans on assumptions, and assumptions carry cost once construction begins. A slope read incorrectly changes a drainage strategy. A protected tree left off a plan creates a setback problem late in the permit process. A neighbouring building's eave height missed from the data introduces an overlooking issue council flag only after plans are submitted. An existing conditions survey in Melbourne , often called a contour and detail survey, replaces those assumptions with measured, licensed and verified site data. It captures full-site features and slope, drainage and service locations, protected trees, existing structures and boundary conditions in one field engagement, giving architects and engineers a base they can design from with confidence rather than guesswork. Linear Land Surveying delivers existing conditions surveys across Melbourne using Leica total stations, GNSS and drone capture, tailoring each survey's scope to the s...

Restrictive Covenant Removal Opens Up Development Potential

Image
A restrictive covenant on a title can quietly block a renovation, a second dwelling or a subdivision long after the original reason for the restriction has become irrelevant. Restrictive covenant removal in Victoria is a legal and technical process, and getting it wrong can mean a rejected application or a stalled project months into planning. Linear Land Surveying manages restrictive covenant removal for landowners across Melbourne and Victoria, working alongside a solicitor to apply through the Supreme Court of Victoria, a planning permit application, or an amendment to the planning scheme depending on which mechanism suits the title. The team reviews the covenant, prepares the required title and site data, and manages the application through to a registered outcome. Most straightforward applications take around three to six months depending on the complexity of the title. Title and covenant review completed before any application is lodged Application prepared via Supreme Court...